Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/asmarapost.com/httpdocs/wp-includes/functions.php on line 6114

Deprecated: Creation of dynamic property AF_themes_info::$theme_version is deprecated in /var/www/vhosts/asmarapost.com/httpdocs/wp-content/themes/covernews/admin-dashboard/admin_dashboard.php on line 38

Deprecated: Creation of dynamic property AF_themes_info::$menu_name is deprecated in /var/www/vhosts/asmarapost.com/httpdocs/wp-content/themes/covernews/admin-dashboard/admin_dashboard.php on line 40

Deprecated: Creation of dynamic property AF_themes_info::$page_name is deprecated in /var/www/vhosts/asmarapost.com/httpdocs/wp-content/themes/covernews/admin-dashboard/admin_dashboard.php on line 41

Deprecated: Creation of dynamic property AF_themes_info::$page_slug is deprecated in /var/www/vhosts/asmarapost.com/httpdocs/wp-content/themes/covernews/admin-dashboard/admin_dashboard.php on line 42

Deprecated: Creation of dynamic property AdminNotice::$page_slug is deprecated in /var/www/vhosts/asmarapost.com/httpdocs/wp-content/themes/covernews/admin-dashboard/rest-api/class-admin-notice.php on line 24
Eritrea Launches Tender for 30 MW Solar Plant - Asmara Post

Eritrea Launches Tender for 30 MW Solar Plant

Eritrea’s Ministry of Energy and Mines has launched a tender for the construction of a 30 MW solar plant in Dekemhare, in the central part of the African country.

The project will include an unspecified amount of battery storage and a 66 kV transmission line. If built, will be the country’s largest PV installation ever built to date.

Interested developers have time until October 17 to submit their proposals.

The African Development Fund (ADF) is helping Eritrea’s government to develop the solar farm and has previously helped the Eritrean authorities seek consultants for the development of the project through another tender.

The Eritrea National Energy Policy, which was issued in 2018, aims to increase the electrification rate across the country. According to the International Renewable Energy Agency (IRENA), Eritrea had just 24 MW of installed PV capacity at the end of 2021.

Source : PV Magazine

Leave a Reply

Your email address will not be published. Required fields are marked *